Abednego, Deo (2026) ANALISIS PENINGKATAN EFISIENSI PRODUKSI KUDA-KUDA BESI DENGAN PENDEKATAN LEAN MANUFACTURING DAN VALUE STREAM MAPPING (VSM) PADA BENGKEL LAS TAKA JAYA. Other thesis, Universitas Setia Budi.
INTISARI & ABSTRAK.pdf
Download (226kB)
LEMBAR PERNYATAAN PERSETUJUAN PUBLIKASI.pdf
Download (399kB)
PLAGIASI_Deo Abednego.pdf
Download (104kB)
COVER - BAB I.pdf
Download (1MB)
BAB 2.pdf
Download (446kB)
BAB 3.pdf
Download (324kB)
BAB 4.pdf
Restricted to Repository staff only
Download (909kB)
BAB 5.pdf
Restricted to Repository staff only
Download (215kB)
DAFTAR PUSTAKA.pdf
Restricted to Repository staff only
Download (192kB)
LAMPIRAN.pdf
Restricted to Repository staff only
Download (1MB)
Abstract
Penelitian ini dilakukan di Bengkel Taka Jaya untuk mengoptimalkan
lini produksi konstruksi kuda-kuda besi yang terindikasi memiliki
efisiensi rendah. Tahapan penelitian dimulai dengan pemetaan aktivitas
menggunakan Activity Mapping untuk mengklasifikasikan aktivitas
Value Added (VA), Non-Value Added (NVA), dan Necessary Non-Value
Added (NNVA). Pengukuran waktu kerja dilakukan melalui Time Study
secara mendalam pada tiga stasiun kerja utama, yaitu stasiun
pemotongan, perakitan, dan pengelasan. Pemetaan kondisi awal
dituangkan dalam Current State Map yang menunjukkan nilai Process
Cycle Efficiency (PCE) sebesar 64,63% dengan total lead time produksi
sebesar 644,93 menit..
Identifikasi akar masalah dilakukan dengan metode 5 Whys Analysis dan
prinsip Ekonomi Gerakan. Hasil analisis menunjukkan adanya
pemborosan dominan berupa waste of motion, waiting, dan defect akibat
tata letak alat yang tidak terorganisir serta metode kerja manual yang
belum terstandarisasi. Berdasarkan temuan tersebut, dilakukan analisis
perbaikan menggunakan teknik ECRS (Eliminate, Combine, Rearrange,
Simplify). Langkah perbaikan meliputi penataan ulang (Rearrange) alur
material antar stasiun kerja guna meminimalkan material handling, serta
pengusulan alat bantu produksi berupa penggunaan Klem C dan
penyediaan rak alat modular di setiap stasiun kerja guna memastikan
posisi peralatan berada dalam jangkauan optimal operator.
Penelitian ini juga merumuskan Standard Work berupa Standar
Operasional Prosedur (SOP) pada setiap stasiun fabrikasi guna
menjamin konsistensi proses. Hasil perancangan kondisi mendatang
yang dituangkan dalam Future State Map menunjukkan peningkatan
efisiensi yang signifikan. Perbandingan performansi menunjukkan
kenaikan nilai PCE menjadi 86,63% dan reduksi total waktu produksi
sebesar 163,83 menit dari kondisi awal. Implementasi usulan ini
membuktikan bahwa integrasi metode Lean Manufacturing dan
Ekonomi Gerakan mampu meningkatkan produktivitas serta standarisasi
kerja pada industri manufaktur skala kecil.
This research was conducted at Taka Jaya Workshop to optimize the
production line of steel roof trusses, which indicated low efficiency. The
research stages began with activity mapping to classify activities into
Value Added (VA), Non-Value Added (NVA), and Necessary Non-Value
Added (NNVA). Work time measurements were performed through an in-
depth Time Study at three main workstations: cutting, assembly, and
welding. The initial mapping was documented in a Current State Map,
which revealed a Process Cycle Efficiency (PCE) of 64.63% with a total
production lead time of 644.93 minutes.
The root cause identification was carried out using the 5 Whys Analysis
method and Motion Economy principles. The analysis results showed
dominant wastes in the form of motion, waiting, and defects caused by
unorganized tool layouts and non-standardized manual work methods.
Based on these findings, improvement analysis was conducted using the
ECRS (Eliminate, Combine, Rearrange, Simplify) technique.
Improvement steps included rearranging the material flow between
workstations to minimize material handling, as well as proposing
production aids such as the use of C-Clamps and the provision of
modular tool racks at each workstation to ensure equipment is within the
operator's optimal reach.
This study also formulated Standard Work in the form of Standard
Operating Procedures (SOP) for each fabrication station to ensure
process consistency. The future state design, documented in the Future
State Map, showed a significant increase in efficiency. Performance
comparison indicated an increase in the PCE value to 86.63% and a
total production time reduction of 163.83 minutes from the initial
condition. The implementation of these proposals proves that the
integration of Lean Manufacturing and Motion Economy methods can
enhance productivity and work standardization in small-scale
manufacturing industries.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Lean Manufacturing, Value Stream Mapping, Time Study, Ekonomi Gerakan, ECRS, SOP Lean Manufacturing, Value Stream Mapping, Time Study, Motion Economy, ECRS, SOP. |
| Subjects: | N Fine Arts > NA Architecture T Technology > TT Handicrafts Arts and crafts |
| Divisions: | Universitas Setia Budi > Fakultas Teknik > S1 Teknik Industri |
| Depositing User: | Unnamed user with email baa.si@setiabudi.ac.id |
| Date Deposited: | 03 Sep 2026 03:30 |
| Last Modified: | 03 Sep 2026 03:30 |
| URI: | https://eprints.setiabudi.ac.id/id/eprint/603 |