GIOVANNI TENTUA, RAUL (2026) Analisis Beban Kerja dalam Menentukan Jumlah Tenaga Kerja yang Optimal di bagian Departemen Polyester Staple Fiber dengan Metode Full Time Equivalent (Studi Kasus di PT. Indonesia Toray Synthetics). Other thesis, Universitas Setia Budi.
1. INTISARI DAN ABSTRACT SKRIPSI RAUL.pdf
Download (195kB)
2. FORM PERNYATAAN PUBLIKASI RAUL GIOVANNI TENTUA.pdf
Download (196kB)
3. CEK PLAGIASI Raul Giovanni Tentua_24juli.pdf
Download (151kB)
4. BAB 1.pdf
Download (589kB)
5. BAB 2.pdf
Download (409kB)
6. BAB 3.pdf
Download (437kB)
7. BAB 4.pdf
Restricted to Repository staff only
Download (767kB)
8. BAB 5.pdf
Restricted to Repository staff only
Download (220kB)
9. DAFTAR PUSTAKA.pdf
Restricted to Repository staff only
Download (279kB)
10. LAMPIRAN.pdf
Restricted to Repository staff only
Download (1MB)
Abstract
Perusahaan manufaktur dituntut untuk mengelola sumber daya manusia secara
efektif agar produktivitas tetap optimal. Salah satu pendekatan yang digunakan
adalah analisis beban kerja, yang berfungsi menentukan jumlah tenaga kerja
ideal sehingga tidak terjadi pemborosan maupun kekurangan tenaga.
Penelitian ini dilakukan pada Departemen Polyester Staple Fiber (PSF)
Polymer Batch PT Indonesia Toray Synthetics, yang sering mengalami
kekurangan tenaga kerja sehingga harus meminjam karyawan dari divisi
Polymer Continuous. Tujuan penelitian ini adalah untuk mengetahui kondisi
beban kerja karyawan apakah termasuk kategori underload, normal, atau
overload, serta menentukan jumlah tenaga kerja optimal menggunakan metode
Full Time Equivalent (FTE). Metode penelitian meliputi observasi waktu
siklus kerja dengan stopwatch study, penilaian allowance, dan rating factor
pada lima stasiun kerja utama: DCS, Charging Raw Material, USG Cutter,
Bunker, dan Packaging Bag Chip. Hasil perhitungan menunjukkan bahwa
Waktu Total Pekerjaan (WTP) seluruh stasiun kerja mencapai 33.288,696
jam/tahun, sedangkan Waktu Kerja Efektif (WKE) per operator adalah 861
jam/tahun. Berdasarkan perhitungan tersebut, kebutuhan tenaga kerja ideal
adalah 38 orang (FTE 38,66). Namun jumlah tenaga kerja aktual hanya 27
orang, sehingga terdapat kekurangan 11 orang. Kekurangan terbesar terjadi
pada USG Cutter (-4 orang) dan Bunker (-3 orang), sedangkan Packaging Bag
Chip relatif normal. Penelitian ini merekomendasikan penambahan tenaga
kerja pada stasiun kerja kritis serta evaluasi sistem distribusi tenaga kerja antar
shift.
Manufacturing companies are required to manage human resources effectively
to maintain optimal productivity. One approach used is workload analysis,
which functions to determine the ideal number of workers to avoid waste or
shortages. This research was conducted at the Polyester Staple Fiber (PSF)
Polymer Batch Department of PT Indonesia Toray Synthetics, which often
experiences labor shortages and has to borrow employees from the Polymer
Continuous division. The purpose of this study was to determine the condition
of employee workloads, whether they are categorized as underload, normal,
or overload, and to determine the optimal number of workers using the Full
Time Equivalent (FTE) method. The research methods included observing
work cycle times with a stopwatch study, assessing allowances, and rating
factors at five main work stations: DCS, Charging Raw Material, USG Cutter,
Bunker, and Packaging Bag Chip. The calculation results showed that the
Total Work Time (WTP) for all work stations reached 33,288.696 hours/year,
while the Effective Work Time (WKE) per operator was 861 hours/year. Based
on these calculations, the ideal workforce requirement is 38 people (FTE
38.66). However, the actual workforce was only 27, resulting in a shortage of
11. The largest shortages occurred in the USG Cutter (-4 people) and Bunker
(-3 people), while Packaging Bag Chip was relatively normal. This study
recommends increasing staffing at critical workstations and evaluating the
workforce distribution system between shifts.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Analisis Beban Kerja, Full Time Equivalent (FTE), Tenaga Kerja Optimal, Waktu Total Pekerjaan (WTP), Waktu Kerja Efektif (WKE). Workload Analysis, Full Time Equivalent (FTE), Optimal Workforce, Total Work Time (WTP), Effective Work Time (WKE). |
| Subjects: | H Social Sciences > HN Social history and conditions. Social problems. Social reform T Technology > TT Handicrafts Arts and crafts |
| Divisions: | Universitas Setia Budi > Fakultas Teknik > S1 Teknik Industri |
| Depositing User: | Unnamed user with email baa.si@setiabudi.ac.id |
| Date Deposited: | 07 Sep 2026 01:54 |
| Last Modified: | 07 Sep 2026 01:54 |
| URI: | https://eprints.setiabudi.ac.id/id/eprint/609 |
